Posts

Showing posts with the label landscape timbers

More Pizza Oven Landscape Timbers And Excavation - March 2025

Image
Progress on the pizza oven MVP continues.  At least in terms of the hard surface part of the project.  Back ten days ago, I showed the first timber (6x6x8 treated ground-contact) being placed on site and talked about how much more excavation was required.  A few days ago, I posted a photo showing the three other timbers that I brought home from the lumber store that were ready to get placed for dry-fitting .  Now that I have the first four timbers on-site, I can start to see how much more excavation is required.  With the wall being about ten-inches-tall, that means that I would like to have about ten-inches of gravel behind the wall.  Thus, excavation is for the space required for the timbers to be square plus ten-inches in each direction.  Below is a look at the current state of the area:  All four timbers are on-site and I've been pulling away at the earth that needs to be retained: My plan is to use a flat shovel to create a clean edge in the...

Pizza Oven Retaining Wall - More Timbers - March 2025

Image
Last I checked-in on the pizza oven ground project, I was dry-fitting the first 6x6 treated (ground-contact) timber that I'll use to retain the earth and (I think) hold in gravel in the middle of the surface.  I spent a little bit of time this past weekend doing more excavation and found time to run to the hardware store to bring home three more 6x6 timbers.   Below, you can see the three timbers (and a pile of bags of gravel) that I'll haul to the backyard in the coming days.  Once back there, I'll use them to make sure I've excavated *enough* earth.  My plan is to dry-fit all of these in the ground, then measure what over-dig still needs to be done that will allow for a foot-or-so of gravel to sit *behind* (earth-side) of the wall.   I'll next update the project once I put all the timbers in and fit.  After that, I'll finalize the excavation, lay down the nonwoven fabric, establish the grade for the first course of timbers with gravel and/or pa...

Pizza Oven Project - Excavation Continues - Dry-Fitting Timber - March 2025

Image
I continue to find small bits of time to excavate and prep the ground in front of the pizza oven slab.  After work, on weekends.  A little bit at a time.  This is #2 on my list of 'priority projects', but that full project also includes weather-proofing the actual oven .  The other part is the hard-surface to stand-on, in-front of the oven.  My (current) thinking is that I'll create an 8x8(ish) area that is edged with landscape timbers.  I'll use a nonwoven geotextile underneath the whole thing and install a couple of timbers as a retaining wall - to help handle the grade change.   Here's my initial excavation post showing some of the dirt removal .   And, just last week, I measured the depth of grade-change at the seven-foot-deep-mark.  About 12" of earth that needs to be held back .  Over the weekend, I picked up one (1) 6x6x8 treated ground-contact landscape timber from the big box lumber store.  It is H E A V Y.  ...