Soapstone Stone Landing - Wood-Fired Pizza Oven Construction - November 2025

Image
Ten days ago, I posted a pizza oven construction update where I talked about the framing that I attached (with concrete anchors) to the block stand and poured hearth .  I used treated lumber to create a ledge and added tile-backer board to support the countertop.  That was in-preparation of the counter being installed.  Recently, the new soapstone counter (or landing) was installed.  A few photos showing the finished stone slab are below.  The soapstone extends beyond the edge of the oven enclosure and will still be 'proud' when the brick is attached. 

Framing Pizza Oven Landing Support - November 2025

Image
A couple weeks back, I posted an update on the pizza oven that showed the treated lumber framing that I attached to the front of the block stand (I used Tapcon concrete anchors) as part of the prep work for the installation of the final counter that serves as the 'landing' of the oven.   In that post, I showed *most* of the framing installed, but since then, the countertop installer came by to measure the space.  When he was here, we talked about extending the front of the framing to provide a bit more support.  And, he suggested that I put down a layer of tile-backer board across the top.  The countertop installer suggested that he would use thinset mortar to affix the countertop in-place and the tile-backer board would provide the right base. As I was looking at the framing that I had already installed, I noticed that the left 'leg' was slightly off (in terms of the correct position), so before I finished up the horizontal surface prep, I moved that leg over....

Building Support for Hearth Landing Ledge - Pizza Oven Construction - October 2025

Image
The last time that I checked in on the backyard pizza oven build, I showed off the full enclosure and roof and talked about how I had some success with a lower-temperature bake .  This was in late September and the oven - at that time - looked like this below.   From the front, you can see the block base and how I had made a temporary hearth landing out of a 2x6 that is supported by some firebrick cut-offs.   That was (obviously) temporary, but it has taken me a while to figure out what I wanted to do there. We seem to have landed on installing a hearth/landing ledge of Soapstone that will stick out from the front of the oven about 10-12 inches.  That will give me a little ledge/counter to work on before/after sliding the pies in/out of the oven.   But, in order to install that ledge, some permanent support needed to be installed.  Based on how I poured the hearth and placed the oven, I left myself four-or-five inches of space to build on top...

Pizza Oven Update: 600-700 degree Bake - September 2025

Image
With the weather-proofing complete on the oven (enclosure and roof structure/sheathing in place), I'm thinking I can start to use it a bit more regularly than I've been able to this Summer.  No need to look at the forecast and find windows where theres no rain in the next few days.  I had to peel off the tarp, install the chimney, fire-up the oven and use it.  Then, wait for it to cool down before I could remove the chimney and then re-cover with the tarp.   Now, the oven is ready to roll when I am ready to bake.  My priority #2 for this year - making the oven function - is completed .  I've learned over the past six months that if I am planning to fire-it-up on a specific day, it is best to light a small fire the night before.  That helps get the oven up to temp and makes the second-day pre-heating go faster/better/easier/quicker. That's what I did this past weekend.  I ran a 4-log fire on one evening.  The next day, I started the pre-h...

Back to Burning - Pizza Oven - September 2025

Image
It has been a few (hot) months since I last burned in the pizza oven. But, with the final winterization happening, we can turn back to the oven this Fall.  The first, small fire I burned on the floor is below:

Extra Insulation on Pizza Oven Dome Via Vermiculite and Perlite - September 2025

Image
Now that the pizza oven enclosure sidewalls are done , I could move on to sheathing the roof and button'ing-up the whole thing.  Before I could close-up the roof, I wanted to add a little bit more insulation to the top and sides of the dome.  On top of the firebrick, I have 4" of cal-sil blanket insulation - which I hard-coated.  On-top of that 4" of blanket is going 20 cubic feet of vermiculite and perlite.  I bought these big 4 cubic-foot-bags of the stuff.  Asbestos-free, of course.   They aren't *that* heavy, so I tug'd each one up the ladder, ripped open the bag and began to pour the insulation in the cavity.  It filled the voids down the sides of the oven along the walls and corners and came-up to the top of the oven.  Adding five-or-so inches of insulation to the sides and a couple to the top.  See below for the vermiculite pour-in: At the top of the dome and below this truss framing, I put in another layer of 2" CalSil insulation...

Pizza Oven Progress - One Of The Sidewalls Installed - September 2025

Image
The last time that I posted about our backyard pizza oven was earlier this Summer in Late May when I showed a long burn in the brick chamber .  But, that doesn't mean progress hasn't been made on completing the build.  Despite some setbacks and the heat of the Summer, I've moved along with my DIY build and have been working to build the enclosure.   That requires walls and a roof.  Both are underway.  But, the photo below shows a milestone:  one of the sidewalls is now completely enclosed.  The corners are built from concrete blocks and the middle section is now covered in fire-resistant concrete board.   I will post the details of the enclosure build (including the concrete blocks) and the roof.  The next step that I'm facing is to close in the other three faces.  Then, pour in some loose insulation.  And, finally...finish the roof.  

Pizza Oven - First Long Bake - May 2025

Image
Recently, we put the oven into service for a small party where I baked eight pizzas.  I've had challenges getting the oven up to temperature with the first firing of the season, so this time I fired it up for three hours the day before the party.  Then, I pre-heated the oven with wood for five hours.  That got the fire roaring and the temps way up:  950 on the dome, 900 on the floor, 750 to 800 on the walls of the dome.   Here are a few photos - showing the fire starting and eventually "Clearing the dome" of the black soot.  Also, I pre-cooked some sausage in a cast iron pan during the pre-heat and that worked really well.   I'm learning how the oven works and how much 'feel' is required to get the pizzas to come out edible.  Also, I'm learning that the insulation that I used is WORKING.  (hooray...)

Finishing Pizza Oven Timber Retaining Wall - Fabric + Backfilling Soil - April 2025

Image
Yesterday, I updated my pizza oven project with the latest progress on the small, timber retaining wall that I've been building in front of the oven.  The goal is to create a small, flat surface that I can use to work/bake in front of the oven.  The grade required a small wall and after hemming-and-hawing on what to do, I opted for action:  get the oven operational. Yesterday's post showed how I set the timbers and backfilled with TONS of gravel for drainage .    The next step in the process is to fold over the non-woven landscape fabric on top of the gravel - this fabric serves as a 'separation layer' from the soil that is behind the gravel.  It also is the separation layer to the soil I intend to pile on top.  Below is a look at the fabric folded back on the gravel: After the fabric was in place, I started to dig out the large pile of earth that I excavated for this project and began to fill in the space.  After a few inches, I compacted the so...

Pizza Oven Patio - Retaining Wall Progress - April 2025

Image
The last post I shared about the pizza oven was back in late March when I shared a photo showing the first four timbers being brought on-site and talked about I was in-the-middle of the excavation.  In that post , I laid out the next few steps (pasted below).  Since that post in late March, I've progressed through the first seven steps and the first part (the hard part) of Step 8.  1. Clear back/sides down grade. 2. Dig out under timbers to drywell stone. 3. Lay out Fabric. 4. Lay down gravel + paver base to create level base for bottom timbers. 5. Start with the timber at the base of the slab, level it out and anchor in the ground with rebar. 6. Work around the timbers - anchoring them with rebar. 7. Stack additional timbers - attach with timberloks. 8. Backfill with gravel, drape the fabric over. 9. Back fill with earth. 10. Fill center with base + gravel. As a reminder, we have a large, deep drywell under this part of the yard.  When I dug the slab foun...

More Pizza Oven Landscape Timbers And Excavation - March 2025

Image
Progress on the pizza oven MVP continues.  At least in terms of the hard surface part of the project.  Back ten days ago, I showed the first timber (6x6x8 treated ground-contact) being placed on site and talked about how much more excavation was required.  A few days ago, I posted a photo showing the three other timbers that I brought home from the lumber store that were ready to get placed for dry-fitting .  Now that I have the first four timbers on-site, I can start to see how much more excavation is required.  With the wall being about ten-inches-tall, that means that I would like to have about ten-inches of gravel behind the wall.  Thus, excavation is for the space required for the timbers to be square plus ten-inches in each direction.  Below is a look at the current state of the area:  All four timbers are on-site and I've been pulling away at the earth that needs to be retained: My plan is to use a flat shovel to create a clean edge in the...

Pizza Oven Retaining Wall - More Timbers - March 2025

Image
Last I checked-in on the pizza oven ground project, I was dry-fitting the first 6x6 treated (ground-contact) timber that I'll use to retain the earth and (I think) hold in gravel in the middle of the surface.  I spent a little bit of time this past weekend doing more excavation and found time to run to the hardware store to bring home three more 6x6 timbers.   Below, you can see the three timbers (and a pile of bags of gravel) that I'll haul to the backyard in the coming days.  Once back there, I'll use them to make sure I've excavated *enough* earth.  My plan is to dry-fit all of these in the ground, then measure what over-dig still needs to be done that will allow for a foot-or-so of gravel to sit *behind* (earth-side) of the wall.   I'll next update the project once I put all the timbers in and fit.  After that, I'll finalize the excavation, lay down the nonwoven fabric, establish the grade for the first course of timbers with gravel and/or pa...

Pizza Oven Project - Excavation Continues - Dry-Fitting Timber - March 2025

Image
I continue to find small bits of time to excavate and prep the ground in front of the pizza oven slab.  After work, on weekends.  A little bit at a time.  This is #2 on my list of 'priority projects', but that full project also includes weather-proofing the actual oven .  The other part is the hard-surface to stand-on, in-front of the oven.  My (current) thinking is that I'll create an 8x8(ish) area that is edged with landscape timbers.  I'll use a nonwoven geotextile underneath the whole thing and install a couple of timbers as a retaining wall - to help handle the grade change.   Here's my initial excavation post showing some of the dirt removal .   And, just last week, I measured the depth of grade-change at the seven-foot-deep-mark.  About 12" of earth that needs to be held back .  Over the weekend, I picked up one (1) 6x6x8 treated ground-contact landscape timber from the big box lumber store.  It is H E A V Y.  ...

More Than One Foot Deep - Retaining Wall - Pizza Oven Project - March 2025

Image
I've excavated the landing in front of the pizza oven a little bit at a time over the past week-or-so.  I've managed to remove about seven(ish) feet x eight(ish) feet in area.  I'd like to get back to (at least) 8x8.  But, I've also begun to figure out what I'm facing in terms of earth that needs to be held back.  Below, is a photo showing the rear edge of the site - showing about eleven-inches of height at seven-feet-back.  The grade isn't too steep in this spot, so if I take out another foot, I'm guessing this might raise up to one-foot-tall.    Here's the initial excavation post from last week . My plan is to get all of the earth removed so I can start to use the eight-foot timber as guide to find level.  Underneath the wall area, I'll excavate a bit to fill with gravel + paver base.   At 12" tall, I'm dealing with a timber with a 5.5" true height.  Thinking two 6x6's (11 inches) might be enough.  But, that all depends on wh...

Excavation Begins on Pizza Oven Hardscape Landing - Priority 2 (Part One) - March 2025

Image
The weather recently has been doing with late Winter/early Spring does around here:  Move all over the place.  Some 60's and some 30's.  I've been trying to fit in some early garden work during the warmer moments - from clean-up to bed extensions to...now...kicking off the pizza oven project for 2025.   I labeled this my #2 priority project earlier this month and talked about getting it 'operational' was my goal :  that means getting it water-tight and getting the hard surface right in front of the oven mud-free - and...presentable.   I am going to first address the hard surface.   This whole project - in the most ideal state - requires A LOT of things - retaining walls, paver patio, covered roof, prep surface and (likely) a bar.  But, for now, I'm looking at what I can get done NOW - this Spring.  And something that is both cost-effective and (at least somewhat) attractive.   There's a 26" drop between the grade of ...

2025 Priority 2: Making the Pizza Oven Functional - March 2025

Image
Yesterday, I posted a list of 18 potential projects that I called "an early look" at some potential priority projects and talked about how I needed to refine the list to bring forward the most critical ones.  The first one on that list that I labeled as a priority in its own post was the bluestone chip gravel path renovation project that calls for the installation of a nonwoven geotextile .   The second priority project is going to focus on my largest project from 2024:  the pizza oven. I've spent a bunch of time ( and a lot of posts ) writing about the oven, including how it will anchor a second, lower-level patio.  That project requires the installation of a retaining wall , a patio floor ( or floating deck ) and more.  I even worked through an 'order of operations' in this post where I talked about the ideal, final state including electrical and prep-space.   But, I know that those projects will take time - likely all summer.  And, I'd l...